Resources | Facilities Operations and Development (2024)

eBuilder

eBuilder Login - for login issues, submit a ticket to Questions/Access/Issues/Feedback

Duo Mobile (Two-Factor Authentication)

Questions/Issues/Feedback

Submittal Register Template

Process Guides

Design Guidelines, Specifications, Standards

Design Guidelines

  • Framework Plan
  • Design Guidelines for Buildings and Landscape
  • Design Review Process

Design Review Board

Specifications and Standards

Building Information Modeling (BIM)

  • Asset Tagging Process Diagram
  • Asset Tag Placement Guide
  • Asset Worksheet Template
  • Project Delivery Standards
  • Execution Plan
  • OSU BIM PDS Tools (zip)

Building Design Standards

Emergency Phones

Sustainable Design and Construction

Lighting Standards

  • 14 ft. Light Poles(zip)
  • 20 ft. Light Poles(zip)

Signage Standards

Utilities

Authority Having Jurisdiction Table

Electronic Drawing Naming

Utility Marking

Utility Outages

Utilities Request - New or Change

Utility Service

  • Domestic Cold Water Checklist
  • Natural Gas Checklist

What If Risk Assessment for Utility System Changes (In the document, mouse-over the headings for tool-tips.)

Building Antenna Installation / Equipment Updates

All private contractors and vendors planning to install new (non-cellular) antennas or update existing antenna equipment on any campus building must receive advance approval via the university Building Antenna Committee. Submit a completed building antenna request approximately four months in advance of the anticipated installation date. This form also includes requests for tornado sirens, flagpoles, cameras, etc. Vendors must attach a Technical Data Sheet and detailed engineering plans and specifications for the request to be processed. Plans and specifications must be compliant with all applicable federal, state, and local laws, and the vendor will be responsible for obtaining all required permits and approvals. For questions, please contact Mike Destadio, Destadio.1@osu.edu.

Antenna Request Form

Technical Data Sheet

Technical Data Sheet Instructions

Professional Services (AE, Commissioning, Limited Scope)

Technical Proposal Guidelines

  • Commissioning Technical Proposal Guidelines
  • Professional Services Technical Proposal Guidelines

Agreements

Agreement Summaries

  • Commissioning Agreement Summary
  • Consultant Agreement Summary
  • Criteria AE Agreement Summary
  • Professional Services Agreement Summary
  • Professional Services Agreement Summary with CMR

Application for Plan Approval

Building Code Compliance Forms

Division of Industrial Compliance Guidelines

Emergency Call List

Equal Employment Opportunity

Pre-Construction Meeting Agenda

Pre-Qualification List

Project Kick-Off Meeting Agenda

Statement of Qualifications (SF330)

Supplementary Conditions

Title Sheet & Title Block Drawings

  • Title Block - Local Administration | dwg | dxf
  • Title Sheet - Local Administration | dwg

Project Manual Coversheet

Responsibility Analysis Evaluation Form

Design Builder (DB)

Technical Proposal Guidelines

  • Design Build Technical Proposal Guidelines
  • Design Build Technical Proposal Guidelines with Competitive GMP

Agreement

GMP Amendment

  • Design Build GMP Amendment
  • Design Build GMP Template - DB GMP Exhibits
  • Design Build GMP Template - Award Non-Specialty Work
  • Design Build GMP Template - Prequal Criteria
  • Design Build GMP Template - Prospective Bidders
  • Design Build GMP Template - Recommendation of Award
  • Design Build GMP Template - Subcontracting Plan
  • Design Build GMP Template - Tangible Property

Equal Employment Opportunity

Emergency Call List

Pre-Construction Meeting Agenda

Division of Industrial Compliance Guidelines

Project Contact Information

Construction Manager at Risk (CMR)

Technical Proposal Guidelines

  • Construction Manager at Risk Technical Proposal Guidelines

Agreement

GMP Amendment

  • Construction Manager at Risk GMP Amendment
  • Construction Manager at Risk GMP Deliverables Transmittal
  • Construction Manager at Risk GMP Template - Award Non-Specialty Work
  • Construction Manager at Risk GMP Template - CMR GMP Exhibits
  • Construction Manager at Risk GMP Template - Prequal Criteria
  • Construction Manager at Risk GMP Template - Prospective Bidders
  • Construction Manager at Risk GMP Template - Recommendation of Award
  • Construction Manager at Risk GMP Template - Subcontracting Plan
  • Construction Manager at Risk GMP Template - Tangible Property

Emergency Call List

Equal Employment Opportunity

Pre-Construction Meeting Agenda

Division of Industrial Compliance Guidelines

Project Contact Information

Construction

Construction and Demolition Reporting

Emergency Call List

Equal Employment Opportunity

Lock Out, Tag Out Procedures

Material Stored Off Site

Parking Permits Request Form

Pre-bid Agenda

Pre-Construction Meeting Agenda

Division of Industrial Compliance Guidelines

Project Contact Information

Projection Screen Procedures

Primary Electrical Service Policy

Request for Interpretation

Construction Site Safety Requirements

University Construction Site Safety Guidelines

Construction Site Safety Matrix

Contractor Pre Work Evaluation

Safety Plan Checklist

Weekly Site Safety Activity Checklist

Site Safety Observation Report

Site Safety Training (Dec 2020)

Risk Assessment and Disaster Preparedness Package

EDGE Program

Encouraging Diversity, Growth & Equity (EDGE),administered through the State of Ohio’s Department Administrative Service, provides business opportunities for economically and socially disadvantaged business enterprises. It established goals for The Ohio State University in awarding contracts to certified EDGE-eligible businesses when procuring supplies, services, professional services, information technology, construction, and professional design.

See the Contractor Opportunities and Bid Results section at the bottom of this page for bid announcements and awards.

Registry - Search for EDGE-certified vendors in your region by discipline.

Forms - Required at the time of contract.

Prevailing Wage

Davis Bacon

State of Ohio

Payment Release Affidavit

Payroll Schedule

Payroll Report Instructions

Payroll Report (NOTE - only include last 4 digits of the SS#)

State of Ohio Prevailing Wage Training

Prevailing Wage FAQs

Post Construction/Close Out

Payment Release Affidavit

Project Closeout Standards

Resources | Facilities Operations and Development (2024)
Top Articles
Latest Posts
Article information

Author: Mr. See Jast

Last Updated:

Views: 5869

Rating: 4.4 / 5 (75 voted)

Reviews: 82% of readers found this page helpful

Author information

Name: Mr. See Jast

Birthday: 1999-07-30

Address: 8409 Megan Mountain, New Mathew, MT 44997-8193

Phone: +5023589614038

Job: Chief Executive

Hobby: Leather crafting, Flag Football, Candle making, Flying, Poi, Gunsmithing, Swimming

Introduction: My name is Mr. See Jast, I am a open, jolly, gorgeous, courageous, inexpensive, friendly, homely person who loves writing and wants to share my knowledge and understanding with you.